Schedule |
Startseite Vorherige Seite Nächste Seite |
Use the “Schedule type” button to select the type of schedule you want. n2pdf Archive has two schedule types:
•Interval The job will be run periodically on the specified days at the specified intervals.
•Once daily The job will be run once a day on the specified days at the specified time
The remaining available settings will depend on which action is selected.
Execution on the following days Used to select the days on which the scheduler will be active.
Daily start time and end time of the execution Use the two field to enter the period (time) when the job will be active and should be run. If the “Schedule type” is set to “Once daily,” you will only be able to enter a start time.
Interval You can use the “Interval in seconds” option to specify the intervals at which the action should be repeated within the selected timeframe (if “Schedule type” is set to “Interval”).
|